
Abraham
|

Abraham--trusses are installed.
|

Abraham--progress is being made!
|

Abraham--it's time to move in!
|

Abraham--entrance to lower garage is under the deck.
|

Baar--basement under construction.
|

Baar--subfloor framing.
|

Baar--garage framing.
|

Baar--pumping second story.
|

Baar--almost ready for the Parade of Homes!
|

This is a Frost Protected Shallow Foundation--a very cost-effective way of building a foundation!
|
DenHartigh--basement and garage foundation
|

This is a picture of Protecto-Wrap, a membrane that covers and protects the foam above the grade and below the siding.
|

Window installed into V-Buck opening.
|

Cutting in for the windows with a reciprocating saw.
|

Floor trusses can be hung from an interior brickledge.
|

Otherwise they can be hung from these brackets.
|

A top plate is normally set inside the foam to attach trusses.
|

Vertical rod is installed after forms are set and before the pour
|

This photo is an attempt to show a straight corner and gable end wall.
|

We can form walls to any angle.
|

Another view of the gable end wall.
|

Here I am trying to show the subfloor sitting on a 4" ledge created by switching form an 8" to a 4" block.
|

This is a wood buck window, you can also see the waterproofing.
|

On upper levels, all bracing must be done from the inside.
|

Wood supported wall.
|

This is a 30' tall straight corner--to show that it can be done!
|

Golden--roof on.
|

Golden--back of house--shows the cement coating between the grade and siding.
|

Gontina--basement only
|
|
Hart--this one had 42 corners!!
|

Juskewicz--you can just see the individual hurricane straps.
|

This is Lite-Deck.
|

This is the shoring under Lite-Deck.
|

Here you can see the radiant heat and the reinforcement installed over the Lite-Deck.
|
The Lite-Deck with all rod installed, and ready to pour.
|

Pouring and finishing Lite-Deck.
|

This is what Lite-Deck looks like after the shoring is removed--ready to park cars on and under.
|
We brace very well!
|